Environmental Assessment (EA) Examples

Check out these recent environmental assessments (EA). These documents are good environmental assessment examples or samples from agencies such the BLM, FHWA, USFWS, DOD, DOE, FTA and many more.

Check out environmental assessments for your state here.

Date Name Type State
05/2010 Highway 130 Draft Environmental Assessment

reconstruction of 9.5 miles of Kea‘au-Pāhoa Road (State Route 130), from the terminus of the existing 4-lane Kea‘au Bypass to its intersection with Pāhoa-Kapoho Road

EA Hawaii
02/2010 Interstate 5 North Coast Corridor Project

Construction and Operation, Upgrade the Freeway with High Occupancy Vehicle/ Manaed Lanes (HOV/ML), Auxiliary Lanes, Direct Access Ramps (DAR), and Possibly One General Purposes Lane, San Diego County, CA

EA California
02/2010 Army Lodging Facility

Fort Lee, Virginia

EA Virginia
02/2010 Pueblo Chemical Depot

Proposed Installation and Operation of Explosive Destruction System and Explosive Destruction Technology

EA Colorado
02/2010 White Oak Road

Road widening from Hoglen Gap to I-40 Exit 15 (Fines Creek)

EA North Carolina
01/2010 Agricultural Research Center

Utah State University Campus The United States Department of Agriculture (USDA) Agricultural Research Service(ARS) is proposing to construct a new Agricultural Research Center (ARC) as part of a collaborative project with the Utah State University (USU) College of Agriculture(COA).

EA Utah
12/2009 Davis County Canal Improvement Project

Davis and Weber Counties

EA Utah
12/2009 Milton-Madison Bridge

Bridge improvements

EA Kentucky
12/2009 Highway Garage Facility

Town of Colchester, NY 1.2 Purpose and NeedThe objectives of the FEMA programs are to reduce the impact of natural disasters on the built environment and to assist communities in recovery from natural disaster.

EA New York
12/2009 Motorola Communications Tower

Motorola MARC RAMBIS Project According to the plans provided by Pyramid (Site Plan, Enlarged Site Plan, and Tower Elevation, prepared by Infinigy Engineering, dated February 18, 2009), a 2,500 square foot fenced compound will enclose the following: the 450-foot lattice guyed tower, a 11-foot by 16-foot equipment shelter on a concrete pad, a 1,000-gallon propane aboveground storage tank (AST) on a concrete pad, a H-frame with a single meter can, and a 50 kilowatt (KW) generator on a 4-foot by 9-foot concrete pad.

EA Missouri
12/2009 Chandler Road Bridge

Replacement The Department of Homeland Security’s Federal Emergency Management Agency (FEMA)proposes to provide partial funding to the Lewis County Public Works Department (Lewis County)for the repair of the Chandler Road bridge crossing over the Chehalis River, near Dryad,Washington.

EA Washington
12/2009 Shell Gulf of Mexico, Inc.

2010 Exploration Drilling Program Purpose and Need: Shell Gulf of Mexico Inc. (Shell) submitted an Exploration Plan (EP) to the Minerals Management Service (MMS), Exploration Plan, 2010 Exploration Drilling Program, Posey Blocks 6713, 6714, 6763,6764, and 6912, Karo Blocks 6864 and 7007, Burger, Crackerjack, and SW Shoebill Prospects, OCS Lease Sale 193, Chukchi Sea, Alaska (Shell Gulf of Mexico Inc., 2009a), dated July 2009, to conduct exploration drilling to evaluate the oil and gas resource potential of three prospects on the company’s Outer Continental Shelf (OCS) leases in the U.S. Chukchi Sea.

EA Alaska
12/2009 Snohomish County Airport: Paine Field

Terminal Expansion

EA Washington
12/2009 Hwy 61

Hastings Bridge Project

EA Minnesota
12/2009 SR 520

Medina to SR 202

EA Washington
11/2009 Goldthwaite Brook Flood Mitigation

City of Peabody, Massachusetts Purpose and Need: The purpose of the proposed project is to eliminate flooding at Peabody Square (Central, Main, and Lowell Streets), Oak Street, Foster Street, and adjacent neighborhoods.

EA Massachusetts
11/2009 Santa Maria de la Mer Senior Living Center

Center Relocation The Santa Maria de la Mer Senior Living Center was located at 674 Beach Boulevard in Biloxi, Mississippi (Figure 1 in Appendix A) and consisted of a 13-story, 209-unit low-income senior living apartment complex.

EA Mississippi
11/2009 Science and Resource Management Facility

Grand Canyon National Park Introduction: Grand Canyon National Park (GRCA) is located on the Colorado Plateau in northwestern Arizona. On January 11, 1908, GRCA was established as a national monument and then dedicated as a national park on February 26, 1919.

EA Arizona
11/2009 Finesville Dam

Restoration of the Lower Musconetcong River Background: The Musconetcong River flows 42 miles from Lake Hopatcong to the Delaware River through a watershed area of approximately 160 square miles.

EA New Jersey
11/2009 Bitter Creek Roads

Bitter Creek Road #4120 and Bitter Creek Cutoff Road #4140 Improvements

EA Utah

Looking for a different environmental assessment (EA)?

Search the NEPA Library

Find out when new documents are added.

Delivered to your inbox on Tuesdays.





Get free (and awesome) planning data tips every month

Copyright © 2009, 2010 Cubit Planning | Terms and Conditions | Privacy Policy | Tours | NEPA Jobs | About | News | Contact Us